Diamonds Magazine

 

ISSUE 13 FEATURES

Convention Centre Demolition

Brokk demolition robot story

Case study Online Concrete Cutting

Say Nammour: Taking flooring to the next level

EPA Classification – 10 years in the making

Download HERE

ISSUE 12 FEATURES

Thiess Tunnel Link

Glen Huntly Reservoir redevelopment

Ross River bridge demolition

Toowoomba takes off

Download HERE

 

ISSUE 11 FEATURES

Melbourne Landmark Demolished

Could your Diamond Blades Kill you

How Great Leaders Create Innovative Cultures

Refurbishing Australia’s Water Supply System

READ ONLINE HERE

ISSUE 10 FEATURES

CSDAA Member Touches up a Historic Victorian Landmark

Wallsawing on QLD’s Legacy Way Project

CDSAA Welcomes Surface Preparation Contractors

DOWNLOAD HERE

 

ISSUE 5 FEATURES

Chatswood to Epping Rail Tunnel

Diamond Core Drilling Used in

Church Restoration

Wire Sawing OLD Quarterdeck Site

Norske Skog Paper Mill in Albury

DOWNLOAD HERE

ISSUE 4 FEATURES

Plunge Wire Sawing On The Lane Cove Tunnel Project

Blue Circle Southern Cement, Geelong

Intercontinental Hotel Sydney

DOWNLOAD HERE

 

ISSUE 3 FEATURES

Large Diameter Core Drilling

Are your Employees Properly Trained

‘Big Boys’ Concrete Gear

DOWNLOAD HERE

 

 

SUBSCRIBE TO DIAMONDS MAGAZINE

Please fill out the form below to receive your copy of the CSDAA Diamonds Magazine

Your Name (required)

Your Email (required)

Street Address (required)

Post Code (required)

State (required)